Property Structural Alterations

Structural Alterations in Hertfordshire, Bedfordshire & Cambridgeshire

Sometimes the biggest improvement isn’t more space — it’s better space. LJT Construction has been carrying out structural alterations across Hitchin, Bedford, Cambridge and the surrounding areas for almost 20 years, opening up layouts safely and to full Building Regulations standard. 

Introduction

A layout that no longer works can make even a spacious home feel cramped and awkward. Structural alterations — removing a wall, installing a steel beam, opening up a kitchen-diner — can transform how a house feels without adding a single square metre. This is precise, safety-critical work, and we carry it out properly: engineer-calculated, Building Regulations compliant, and finished so you’d never know a wall was ever there. 

Types of Structural Alteration We Carry Out

Why Choose LJT Construction

Our Process

Free consultation and survey

We visit your property, understand what you’re trying to achieve, and advise on the structural work involved.

Structural design

We work with a structural engineer to calculate the correct beam sizes and supports, and handle Building Regulations applications.

Temporary support

Properly propping the structure before any wall or chimney breast is touched.

Structural work

Removing the wall or chimney breast and installing the calculated steel or timber support.

Finishing touches

Making good the plasterwork, ceiling and floor so the alteration looks like it was always part of the house.

Do You Need Planning Permission?

Most internal structural alterations, such as removing a load-bearing wall or chimney breast, don’t require planning permission since they don’t affect the external appearance of the property. Building Regulations approval is always required for structural work, including sign-off from a structural engineer. We’ll assess your property at the free survey stage and handle any applications on your behalf. 

FREQUENTLY ASKED QUESTIONS

How do I know if a wall is load-bearing?

It’s not always obvious from looking at a wall alone — it depends on how the floors and roof above are supported. We assess this properly at survey stage, and any load-bearing work is confirmed by a structural engineer before we proceed. 

A single load-bearing wall removal typically takes 3 to 5 days including making good, though this can vary depending on the span and what’s above. We’ll give you a clear timeline before work begins. 

Most clients stay in their homes during structural alterations, though the room being worked on will be out of use for the duration. We manage dust and access carefully to minimise disruption to the rest of the house. 

Cost depends on the span of the beam needed, the complexity of the support required, and any making good afterwards. We provide a detailed, no-obligation quote after a free site survey and structural assessment. 

Ready to open up your home's layout?

Get in touch today for a free, no-obligation structural alterations quote and friendly advice from a builder who’s seen it all. 

Scroll to Top